Parking lot B closed for resurfacing
Contractors will resurface and repaint Parking Lot B. Vehicles left in the lot after 6:00 a.m. on April 18 may be towed at the owner’s expense.
Shuttle stops near Lot C will run every 15 minutes during the closure.